Use case 2 · Acceptance sampling
Sampling what a vendor sends in the plan's name
The pattern
A template error at a vendor repeats in every notice until someone at the plan reads one. The question is how many to read.
- Question
- How many vendor notices should the plan read each week?
- Lane
- Delegated vendor
- Basis
- Standard practice
What METRIS does
- Draw a random weekly sample of each vendor's notices and check them against plan rules
- Size the sample to the error rate the plan cannot tolerate
- Report errors per vendor and template, and the members affected before detection
Chance one weekly sample catches the error
Reading 59 notices a week gives a 95% chance of catching a 5% error rate; a 1% rate needs 299. Exact binomial probabilities.
Method
- Weekly volume (V)
- 5,000 notices
- Error rates (p)
- 1%, 3%, 5%, 10%
- Sample (n)
- 5 to 300 a week
- Detection
- At least one wrong notice in the sample
Reading notices at random is cheap; reading the right number is the difference between about 150 affected members and about 1,000.
Members affected before detection
With 5,000 notices a week and 3% wrong, reading 10 a week lets about 571 members get a wrong notice before detection; reading 100 cuts it to 157. Past about 100 the gain flattens.
Reproducibility
Closed-form binomial calculation, treating each read as independent (a close approximation when the sample is small next to weekly volume); no random draws. Python with NumPy 2.5.3 and SciPy.
Sources
This pattern is not based on any single record. Its figures come from the model stated above.
A statistical study of a pattern, not of any event. It identifies no organization or person. Simulated figures use synthetic data; published figures are industry-wide.